Kit Includes: (1) 17.6oz/500ml Fernox Protector F1, (1) 17.6oz/500ml Fernox Cleaner F3, (4) Fernox pH Test Strips, Instruction Leaflet
Good practice dictates that hydronic central heating systems should be thoroughly cleaned and flushed before installing a new boiler, after which a chemical inhibitor should be added to ensure the system is protected from corrosion, scale and sludge build-up. These procedures should also be employed when major work is carried out on a system. A clean, protected system helps ensure that the heat generated by the boiler is transmitted efficiently into the house over long term.
Maintain the design specification and energy efficiency
Restore energy efficiency
Inhibit the formation of scale and sludge
Minimize corrosion of system metals
Maintain the design specification and energy efficiency
Restore energy efficiency
Inhibit the formation of scale and sludge
Minimize corrosion of system metals